Construction Standards
CONSTRUCTION AND ENGINEERING STANDARDS
Below are several standard drawings as provided by NTM in jpg and pdf formats. Please confirm that you have the latest version prior to submitting drawings for approval. The specifications and notes document is provided in pdf and doc formats.
Development and Construction
Document Name | | | Format |
---|---|---|
Utility Permit | | | |
Water and Sewer Availability (for Building Permit) | | | |
Development/Construction Plan Review Check List |
| | |
Combined Water and Sewer Easement Language | | | |
Water Only Easement Language | | | |
Sewer Only Easement Language | | | |
Tap Fees, Charges and Water Rates | | | |
Standard Developer Notes | |
| |
|
Local Contractors/Engineers with Positive Customer Feedback | | | |
Soil Amendment Specifications | | |
Sewer Details
Document Name | | | Format | |
---|---|---|---|
S1 – Sanitary Service Connection | | | jpg | |
S2 – Manhole Detail | | | jpg | |
S3 – Inside Manhole Drop | | | jpg | |
S4 – Flat Top Manhole Lid | | | jpg | |
S5 – Sanitary Sewer Crossing | | | jpg | |
S6 – Sand/Oil Interceptor | | | jpg | |
S7 – Sewer Sampling Manhole | | | jpg |
Example Drawings
Water Details
Document Name | | | Format | |
---|---|---|---|
W1 – Trench Section | | | jpg | |
W2 – Poly Wrap | | | jpg | |
W3 – Kick Block | | | jpg | |
W4 – Gate Valve | | | jpg | |
W5 – Fire Hydrant | | | jpg | |
W6 – 3/4″ and 1″ Water Service Line | | | jpg | |
W7 – Sampling Station | | | jpg | |
W8 – Temporary 2″ Blow-Off | | | jpg | |
W9 – Unused | | | jpg | |
W10 – Restrained Length Detail | | | jpg | |
W11 – Tracer Wire System | | | jpg | |
W12 – Pipe Casing | | | jpg | |
W13 – Air Valve Assembly Detail | | | jpg |